  • QHD32-6 project CEPI / CEPJ commissioning 2016-03-29

    The delegate: cnooc engineering commissioning technology; Project scale: the two center platforms Project Type: Commissioning; Scope of work: block process, mechanical, electrical, instrumentation full professional comm…

  • Bonan desulphurization project 2016-03-29

    Client: CNOOC Tianjin Branch Bonan Operating Company Project size: Terminal gas processing design size 120 × 104Sm³ / d Project type: Modification design Project Time: 2014 Scope of work

  • Huangyan gas-field development project TWT-CEP modification detail desi… 2016-03-29

    Client: CNOOC Shanghai Branch Size: Glycol regeneration 50m³/d, dry gas booster 400x104Sm³/d Project Type: Detail design Project Time: 2013

  • Modification for JZ 9-3 Existing Platform 2016-03-29

    Client: CNOOC Energy Technology & Services Limited Oilfield Construction Engineering Company R & D Center Project Size: Modification for the existing 4 platforms Project Type: Detail design Project Time: 20…

  • Comprehensive utilization of natural gas in Jixian County 2016-03-29

    Comprehensive utilization of natural gas in Jixian County Client: Ao De Natural Gas Co. Ltd. Project scale: A new natural gas station, gas volume 5~8 × 108Nm³/a Project type: Construction drawing design Project t…

  • WZ 11-2 WHPB Jacket Detail Design 2016-03-29

    Client: Zhanjiang Nanhai West Oil Exploration & Design Co., Ltd. Size: 3-leg 3-pile jacket Project Type: Jacket detail design Project Time: 2014 Scope of work: 1. Project detail design; 2. Third-party review

  • Detail design for Tianjin LNG FSRU gasification capacity replacement p… 金沙娱城js3311 com

    Principal: Offshore Oil Engineering Co., Ltd. Size: CNOOC Tianjin LNG FSRU project gasification capacity replacement project for an optimal adjustment of the project in advance, gasification station outside the transm…

  • EP oilfield development project - LQ detail design 2016-03-29

    Client: Offshore Oil Engineering Co., Ltd.(COOEC) Size: 3 LQs(120 men) for EP, HZ, XJ oilfield; one LQ(140 men) for Panyu Project Type: Detail design Project Time: 2013 Scope of work: 1. Review for …